Construction Information for the Phase II and III Townhouses

NOBE is the main construction contractor for Phases II and III of the Luige Kodud development.

  • Structures

    Structures

    • Foundation: Reinforced concrete strip foundation
    • Load-Bearing Exterior Walls: Bauroc Ecotherm+ 375
    • Walls Between Apartments and Stairwells: Fully concreted hollow-core concrete block (240 mm)
    • Non-Load-Bearing Walls: Gypsum board walls on a steel frame or lightweight block, as needed
    • Intermediate Floors: Reinforced concrete hollow-core slabs
    • Windows: Triple-glazed plastic profile windows
    • Doors: Solid wood interior and exterior doors for apartments
    • Facade: Wooden cladding combined with facade plaster
  • Utilities

    Utilities

    • Heating: Geothermal heating with room-specific adjustable underfloor heating
    • Ventilation: Forced ventilation with heat recovery
    • Water and Sewerage: Central domestic water supply and sewerage
    • Electricity: Terraced house electricity via a collective purchasing scheme, solar panels, and electric car charging infrastructure readiness
    • Telecommunications and Cable TV: Ready for service connection (operator neutral cabling provided)
    • Master key system
  • Interior finishing

    Interior finishing

    At Luige Homes, there are no standard developer-defined interior finishing packages. Instead, we’ve curated a selection of high-quality interior finishing materials available on the market, giving you the freedom to choose and combine the materials that best suit your style.